Reconnecting communities in Halewood

ITP supported Knowsley Council in transforming Higher Road into a coherent active travel corridor, delivering protected cycling infrastructure, safer crossings and improved connections across Halewood.
A562 Higher Road Cross

Project facts

Client
Knowsley Council
Location
Halewood, Merseyside, UK
Period
2024-2025
Sector
Travel and Infrastructure Design
Challenge
Transforming a fast, car-dominated corridor that divided communities and lacked safe, continuous provision for walking and cycling.
Solution
Integrated highway and active travel design, stakeholder engagement and Principal Designer support, creating a fully segregated corridor with safer junctions, crossings and public realm improvements.

Creating a corridor that reconnects Halewood

Higher Road is the main eastern gateway into Halewood, linking established neighbourhoods, new housing, schools, shops and major employment areas with Liverpool and the wider region. Despite this role, the corridor had long divided communities: high vehicle speeds, limited crossing points, outdated junctions and no protected cycling infrastructure made walking and cycling difficult, particularly for children and less confident users. 

ITP, Haskoning’s specialist, UK-based transport team, was commissioned by Knowsley Council to help transform Higher Road into a safer, more inclusive and better-connected corridor. The aim was to create a coherent active travel route that reconnected communities, integrated new development and supported safer everyday journeys between homes, schools, employment areas and the National Cycle Network. 

Transport engineering, active travel design and behavioural insight were combined from the outset. By walking the route with Knowsley Council, the team identified desire lines, safety risks, frontage constraints and gaps in the network, shaping a continuous two-way segregated cycleway that switches sides where needed to maintain connectivity while limiting impacts on residents and property access. 

Turning feasibility proposals into an ambitious design

Early feasibility work proposed a limited painted cycle lane. Through iterative design reviews, ITP and Knowsley Council developed this into a substantially more ambitious, fully segregated scheme for people of different ages, abilities and cycling confidence. 

A central intervention was the redesign of the Finch Lane and Baileys Lane junction. The previous roundabout caused congestion, offered poor crossing opportunities and created conflict between vehicles and people walking or cycling. It was replaced with a signal-controlled CYCLOPS junction, separating pedestrian and cycle movements from traffic and providing a clearer, safer way to navigate this major four-arm junction. 

The junction approach was also redesigned as a distinctive gateway into Halewood, using alignment changes, Manual for Streets-compliant geometry, landscaping and managed sight lines to moderate vehicle speeds as drivers moved from faster rural and motorway conditions into a more people-focused urban environment. 
 
Further interventions included:

  • A 3-metre-wide segregated cycleway between Finch Lane and Leathers Lane.
  • Signalised pedestrian and cycle crossings at key junctions.
  • A sparrow crossing at Old Hutte Lane to separate cyclists from pedestrians.
  • Cyclist-activated sensors at Leathers Lane to improve signal responsiveness.
  • New toucan crossings supporting east-west journeys towards Jaguar Land Rover.
  • Carriageway realignment, pavement widening, drainage improvements and public realm enhancements. 

Together, these measures addressed the “missing links” that can weaken active travel schemes, creating a continuous, intuitive and protected route rather than a series of disconnected interventions. 

A562 Higher Road Cross
A562 Higher Road Cross

Delivering through close partnership 

Delivery was phased to maintain access for residents and businesses and manage disruption along this strategic corridor. Feasibility work, utility investigations and detailed design informed the construction sequence, with major junction works delivered before wider corridor improvements. 

ITP acted as Principal Designer throughout construction. Weekly multidisciplinary coordination meetings and twice-weekly site inspections enabled design queries, sequencing issues and buildability challenges to be resolved quickly. The team worked closely with Knowsley Council, Tarmac, Unix and specialist subcontractors, maintaining technical oversight while supporting practical decision-making on site. 

Stakeholder engagement continued during delivery, including coordination with emerging development plans and responses to residents’ concerns about frontage impacts and access changes. Section 106 funding from new housing development was used alongside the City Region Sustainable Transport Settlement, while the design was future-proofed to connect with planned links towards Halewood town centre and the wider walking and cycling network. 

This collaborative approach helped Phases 1 and 2 open within 18 months of construction starting. Knowsley Council credited the ahead-of-programme delivery to close partnership working, proactive problem-solving and a shared commitment to design and construction quality. 

Creating lasting community and transport value 

The completed scheme has transformed a corridor that previously offered little safe active travel provision. Continuous segregated infrastructure, redesigned junctions and safer crossings now support journeys between neighbourhoods, schools, shops, employment destinations and onward routes into Liverpool. 

The changes have also improved the operation and character of Higher Road. Reconfigured junctions and more effective use of road space have reduced conflict and risky driver behaviour, while the redesigned gateway encourages lower speeds and a clearer transition into the urban area. Knowsley Council has reported safer movement across the corridor, calmer traffic behaviour, smoother access to residential areas and substantially improved walking and cycling provision. 

Twelve-hour cyclist counts in summer 2025 recorded an uplift of approximately 75 per cent in daily cycle use from a near-zero baseline. The route has also been endorsed by the Liverpool City Region Cycling and Walking Commissioner for enabling children to travel to and from school safely, healthily and independently. 

The scheme’s quality and ambition have attracted interest from neighbouring authorities and regional partners seeking insight into its design, funding and delivery. It is now viewed as an exemplar active travel scheme and a model for how high-quality infrastructure, technical design and partnership working can support lasting behaviour change.

Value delivered 

  • Transformed a previously unsafe and disconnected corridor into a continuous, fully protected active travel route.
  • Reconnected communities divided by Higher Road and improved links to schools, homes, shops, employment sites and Liverpool.
  • Upgraded an early painted-cycle-lane concept into an ambitious segregated scheme designed around real user needs.
  • Introduced a CYCLOPS junction, signal-controlled crossings and a redesigned gateway to reduce conflict and moderate vehicle speeds.
  • Provided Principal Designer support and multidisciplinary coordination throughout construction.
  • Helped deliver Phases 1 and 2 ahead of programme through close collaboration and rapid resolution of site issues.
  • Recorded an approximately 75 per cent uplift in daily cycling from a near-zero baseline.
  • Created a future-proofed corridor capable of connecting with planned development and the wider regional active travel network.
  • Established an exemplar scheme that is informing conversations with other authorities and regional partners. 

Why it matters

The Higher Road project demonstrates how integrated highway engineering, active travel design and collaborative delivery can turn a road that divides communities into infrastructure that reconnects them. By moving beyond minimum-standard provision and designing around safety, continuity and everyday journeys, ITP and Knowsley Council created a corridor that supports sustainable growth and delivers immediate benefits for residents. The scheme shows how strong technical design, effective use of development funding and close construction-phase collaboration can create active travel infrastructure that is both ambitious and deliverable. 
Our experts are happy to assist you - Experts team Planning and Designing Major Infrastructure

Our expertsare happy to assist you

Experts team Planning and Designing Major Infrastructure

Planning a major infrastructure project?

Discover how our transport planning, engineering design and delivery experts help clients move complex infrastructure projects from concept through consent and into construction.
Explore our expertise
Aerial view of a major port and logistics hub featuring container terminals, rail freight infrastructure, warehouses and waterfront shipping operations.